Daily life
Utilities, internet and phone in Madeira
Electricity in Madeira comes from one regional company, EEM, and water from your municipality. Internet and phone are national contracts, so the main thing to watch is the lock-in period.
Last checked November 2026 against the official sources below
Electricity: EEM
The Empresa de Electricidade da Madeira (EEM) is both the network operator and the supplier on the island. The regional government's social tariff page names EEM as the retailer. We did not find an official page on choosing another supplier in Madeira, so assume you deal with EEM for the contract, the meter and the bill.
- Moving into a home that already has power: ask for a change of holder (mudança de titular) in your name, giving the current meter reading. EEM lists the required documents on its Contratação page; we could not read that list, so confirm it before you go.
- Reconnection is possible if the home previously had electricity and the low-voltage installation has not changed.
- A new connection (new build or renovation) goes through a responsible technician who files the mandatory supply request (RFE). Power increases above the requested power also need an RFE.
- Where to apply: any EEM store, or the customer line 800 221 187 (free, daily 08:00 to 00:00). Many requests can be made through the EEM Online customer area.
Put the contract in your own name. The social tariff, and most other protections, attach to the contract holder, and a contract in the landlord's name leaves you without proof of address in your name. The deposit (caução) calculation is on a separate EEM page we did not open, so we give no figure.
You pay a contracted power level. EEM publishes power tiers and a calculator on its site; if you exceed your contracted power the supply trips.
The social tariff
The regional government states that the social tariff gives a 33.8% discount on the electricity bill (page dated 25 August 2026). It applies to a contract that is:
- in the holder's name, for domestic use in a permanent home;
- up to 6.9 kVA contracted power;
- and the household is on certain benefits (old-age solidarity supplement, social insertion income, unemployment benefit, family allowance, social disability or old-age pension), or its annual income is at or under the limit, increased by 50% for each household member without income.
It is granted automatically: eligibility is cross-checked with Segurança Social and the tax authority and EEM applies it to the bill. If you think you qualify and have not been flagged, ask EEM, with a certificate from Segurança Social or the Finanças showing your name, NIF and permanent address matching the supply address. Eligibility is reconfirmed each September, and it follows you if you move, as long as your address is updated with both bodies.
Both the regional page and DGEG give €6,272.64 a year as the base household income limit (the regional page prints it with a typo, so the figure is the one DGEG gives). Confirm the current limit with EEM.
Smart meters
EEM is replacing meters on the island with smart meters at no cost to the customer. According to EEM, you get advance notice by letter, the power is cut for an estimated 10 to 30 minutes, and readings are sent automatically every 15 minutes, so bills are based on actual consumption. Your consumption history (up to 36 months) is visible in EEM Online. The page said the whole island would be covered by 2025, but it only showed Ajuda as taking bookings, so rollout in your area may still be pending. Ask EEM.
Water, sewage and waste
Water is a municipal service, so the rules and tariffs depend on the Câmara of the concelho you live in. We could only verify Funchal.
- In Funchal, the Câmara is the managing entity for water and sewage, and one contract covers water supply, wastewater and urban waste. Offices: Loja do Munícipe (Rua 5 de Outubro 63) and Loja do Cidadão (Av. Arriaga 42 A), phone +351 291 211 000.
- The contract cannot be transferred. When the holder changes, a new contract is made with the required documents. We could not see a document list.
- Billing is monthly, with a fixed charge and a volume charge in tiers; tariffs are approved yearly by the Assembleia Municipal and published on the Câmara's site, with special tariffs for large families and households in economic need.
- The Câmara says it will start the contract within 5 working days of the request. To cancel, you give written notice, allow a meter reading within 15 days and pay all outstanding bills.
- If a sewage connection becomes available, connecting to it is mandatory and septic tanks must go.
For other municipalities, ask the Câmara directly. We did not verify their rules.
Internet and mobile
Telecoms are a national, liberalised market regulated by ANACOM. The gov.pt guide says you can choose any operator, that the ANACOM tariff comparator helps you compare offers, and that moving into a home previously served by an operator does not oblige you to keep it. It also says there is no law setting minimum service quality or maximum installation times, so the contract should state them.
- If an operator cannot provide the service because of lack of coverage, you can cancel and request a refund of everything you paid.
- Promotional offers can carry a loyalty period (fidelização). Leaving early may mean paying the amount set in your contract. Read the length, the stated benefit and the exit charge before signing.
- To cancel, ask the operator about the notice period, the end date of billing, what documents it needs and whether you are still in the loyalty period. Once it receives a complete request it must confirm within 5 days. If your request is incomplete, it must list what is missing within 3 working days.
- Operators ask for your NIF, a bank account (IBAN) for direct debit and often proof of address such as a lease. See NIF and bank account. We did not verify each operator's exact requirements.
Fibre and mobile coverage varies between the south coast, the north and the mountains. We did not find an official Madeira coverage source, so check the address with each operator and the ANACOM comparator before you sign a lease or contract.
Complaining and disputes
- Contact the provider first (EEM, the Câmara or your operator) and keep a written record.
- Livro de Reclamações: for telecoms, the gov.pt guide says to use the online or physical complaints book if the operator does not answer or you are unhappy with the reply; the operator must reply within 15 working days. EEM and the Câmara also have a Livro de Reclamações (the Funchal regulation says it answers written complaints within 22 working days and that the water regulator ERSAR also takes complaints).
- Arbitration: Madeira has its own consumer arbitration centre, the CACC RAM, at Rua Direita 27, 1.º Esq., Funchal, phone +351 291 147 115. Its site lists a section on essential public services. The gov.pt guide also names Julgados de Paz and says arbitration is faster and cheaper than court.
ANACOM (800 206 665, weekdays 9:00 to 16:00, [email protected]) supervises operators but, per gov.pt, does not resolve individual disputes.
For water, filing a complaint does not suspend the payment deadline, except when you allege a metering error and ask for an extraordinary meter check.
What we could not verify
- The exact documents and deposit EEM requires for a new contract or change of holder.
- The legal maximum length of a telecom loyalty period. The gov.pt guide states none and ANACOM's pages would not open for us, so check your contract and ANACOM.
- Gas: we did not verify bottled or piped gas arrangements in Madeira.
- Operator names, prices and fibre coverage by area in Madeira.
- Water and waste rules outside Funchal.
Sources
- EEM: customer area (Contratação, Faturação, Livro de Reclamações)
- EEM: requisição de fornecimento de energia elétrica
- EEM INOV: contador elétrico inteligente
- madeira.gov.pt: Tarifa Social da Eletricidade (page dated 25 August 2026)
- DGEG: conditions for the social energy tariff
- Câmara Municipal do Funchal: water, sewage and waste contract regulation
- gov.pt: communications services in Portugal (updated 27 April 2026)
- madeira.gov.pt: Centro de Arbitragem de Conflitos de Consumo da RAM